by Philip Leveridge
on January 1, 2018
- Before
Before
Fontaine Ave, Lakeway, Austin, TX – 2017
- Before
Before
Design & Installation, Summer / Fall 2017
Claustrophobic Shrubbery
- Before
Before
Boxwood Islands and overgrown shrubs had to go.
- Before
-
- Before
Before
Side Area needing better proportions
- Design / Visualization
Design / Visualization
Exploring materials, layouts and planting schemes
- Design / Visualization
-
- Design / Visualization
-
- Design / Visualization
Design / Visualization
Pathway creation through front horseshoe (concept)
- Design / Visualization
-
- Design / Visualization
Design / Visualization
Introduction of a Water Feature
- Design / Visualization
-
- Design / Visualization
-
- Tear-Out
Tear-Out
Turf-Removal in front Horseshoe
- Tear-Out
-
- Tear-Out
Tear-Out
3 Dumpsters later and the final shrubs are ready to go
- Tear-Out
Tear-Out
Expansion of Front Entryway
- Tear-Out
-
- Tear-Out
Tear-Out
Integrating Irrigation & Electrics
- Tear-Out
Tear-Out
3-Piece Basalt Water Feature going in
- Tear-Out
-
- Water_Feature
Water_Feature
Fountain is positioned in front of window – water top-up valve is integrated into the plumbing
- Final Design
-
- Final Design
Final Design
Steelwork and Softening Artemesia
- Final Design
Final Design
Front Horseshoe (Streetside)
- Final Design
Final Design
Front Horseshoe (Houseside)
- Final Design
Final Design
Steps lead up to a now flattened top grade
- Final Design
Final Design
Central Flagstone Pathway breaks up the area
- Final Design
-
- Final Design
-
- Final Design
-
- Final Design
-
- Final Design
-
PreviousNextPreviousNext